Entity map
How Pencl fits into the UK trade ecosystem
A machine-readable map of Pencl, the trade entities we serve, the regulators we link to, and the concepts our editorial covers.
Machine-readable version: /entitymap.json.
Brand
Pencl
Operated by Pencl Ltd, England and Wales.
Founded 2026. UK-only. £25 per seat per month plus 1.5% Stripe Connect platform fee.
Trades we serve
- plumber
Wikipedia · SOC code 5314
- electrician
Wikipedia · SOC code 5241
- builder
Wikipedia · SOC code 5319
- roofer
Wikipedia · SOC code 5313
- plasterer
Wikipedia · SOC code 5321
- painter and decorator
Wikipedia · SOC code 5323
- joiner
Wikipedia · SOC code 5315
- tiler
Wikipedia · SOC code 5322
- gas engineer
Wikipedia · SOC code 5217
- bricklayer
Wikipedia · SOC code 5312
- landscaper
Wikipedia · SOC code 5113
- kitchen fitter
- bathroom fitter
- window fitter
- damp specialist
Regulators and trade bodies
HM Revenue and Customs
UK tax authority. Source of truth for CIS, VAT reverse charge, self-assessment and the flat-rate scheme.
Health and Safety Executive
Enforces CDM 2015 and workplace health and safety law for construction work in Great Britain.
Gas Safe Register
Official register of gas engineers legally allowed to work on gas appliances in the UK.
NICEIC
Largest UK voluntary regulator for the electrical contracting industry. Part Approved Contractor schemes.
NAPIT
National Association of Professional Inspectors and Testers. Government-approved Part P registration body.
Same as: Homepage
ELECSA
Part P-approved competent person scheme for electricians, now part of the NICEIC group.
Same as: Homepage
FENSA
Fenestration Self-Assessment Scheme. Allows competent installers to self-certify replacement window installations.
Certass
Alternative competent person scheme for window, door and conservatory installations.
Same as: Homepage
WaterSafe
UK-wide accreditation body for approved plumbers. Combines APR, WIAPS, SNIPEF approved schemes.
Same as: Homepage
Microgeneration Certification Scheme
Quality assurance scheme for renewables installers (solar, heat pumps). Required for most government grants.
Same as: Homepage
TrustMark
UK government endorsed quality scheme for tradespeople doing work in and around the home.
Same as: Homepage
Federation of Master Builders
UK construction trade body for SME builders, established 1941. Members vetted for quality and financial standing.
Concepts our editorial covers
RAMS (Risk Assessment and Method Statement)
Combined document required for most construction sites under CDM 2015. Risk Assessment identifies hazards; Method Statement defines how work is carried out safely.
Construction Industry Scheme
HMRC scheme requiring contractors to deduct money from subcontractor payments (20% standard, 30% unregistered, 0% gross-paid). Counts as advance payment toward subcontractor tax and NI.
VAT reverse charge for construction services
Since March 2021, VAT-registered builders selling services to other VAT-registered businesses in the construction supply chain no longer charge VAT. The recipient accounts for it instead.
Construction (Design and Management) Regulations 2015
Statutory framework for managing health and safety on construction projects. Sets out client, principal designer and principal contractor duties.
Building Regulations Part P (Electrical safety)
Approved Document requiring most domestic electrical work in England and Wales to be either notified to Building Control or carried out by a Part P registered competent person.
Electrical Installation Condition Report
Periodic inspection report grading the safety condition of an electrical installation. Required every 5 years for rented homes in England.
Gas Safety Certificate (CP12)
Annual safety check record for gas appliances. Mandatory for landlords every 12 months. Issued by a Gas Safe registered engineer.
Schedule of Works
Itemised list of every task in a construction project, used as the basis for pricing, tendering and managing variations.
Retention
Percentage of contract value (typically 3-5%) held back by the customer until practical completion and the defects liability period ends.
Stage payment
Phased payment milestones agreed in advance, payable on completion of defined stages of the works.
Practical completion
Point at which works are complete except for minor snagging. Triggers handover, the defects liability period and release of half of retention.
Snagging
Process of identifying and rectifying minor defects after practical completion but before final account settlement.
Variation order
Written instruction to change the scope of works mid-project. Forms the basis for revised pricing and the variation account.
Method statement
Step-by-step written description of how a specific work activity will be carried out safely, with the control measures for identified risks.
Why an entity map?
AI search engines and traditional crawlers benefit from explicit mappings between a website and the wider knowledge graph. By naming the regulators, trade bodies and concepts Pencl covers, and linking each to its canonical Wikipedia, Wikidata and gov.uk entry, we make it unambiguous what our content is about.
The machine-readable twin at /entitymap.json carries the same data as JSON with stable identifiers so it can be ingested by retrieval pipelines.
Published by Pencl, the survey-to-quote platform for UK tradespeople.