What to charge
Price the whole job, labour only, with the customer supplying the suite, tiles and fittings.
Basic 3-piece suite£1,200–£1,8003 to 5 days on site, labour only
Full refit with tiling£1,800–£4,0006 to 8 days on site, labour only
Wet room£2,200–£3,000labour only, customer supplies materials

Day rates by region
London£250–£350 a day
South East£250–£350 a day
East£200–£300 a day
Midlands£200–£300 a day
South West£180–£280 a day
Wales£180–£280 a day
North£180–£250 a day
Scotland£180–£250 a day
What moves the price
Number of piecesa 4 or 5-piece bathroom or en-suite takes longer than a 3-piece.
Strip-outremoving the old suite and tiles is extra time and waste, often £600 to £1,000.
Tiling areafull-height tiling on walls and floor adds days to the job.
Moving pipeworkrelocating the toilet, bath or shower adds plumbing time.
Electricsnew lighting, fans or heated towel rails need an electrician.
LocationLondon and the South East sit at the top of the day-rate range.
Materials
3-piece suite£200–£1,000
Basic ceramic tiles£15–£20 per m²
High-end porcelain tilesup to £60 per m²
How long it takes
A standard 3-piece takes 3 to 5 days and larger installations 7 to 10 days.
Questions
How much is labour only for a new bathroom?
Published 2026 guides put labour for a full bathroom installation at £1,800 to £4,000, excluding materials.
What does a basic 3-piece suite fit cost in labour?
A standard 3-piece bathroom is quoted at £1,200 to £1,800 labour only, taking 3 to 5 days.
What should I charge to rip out the old bathroom?
Removal of the old bathroom is quoted at £600 to £1,000 as a separate line.
How long does a bathroom refit take?
A standard 3-piece takes 3 to 5 days and larger installations 7 to 10 days. A full refit with tiling is often 6 to 8 days.
Do London fitters charge more?
Yes. Guides put London and the South East at £250 to £350 per day, against £180 to £250 in the North and Scotland.